FIRE SERVICE BUILDING UPGRADE 165 PHILIP STREET SYDNEY
RICHARD CROOKES CONSTRUCTIONS
Electric/Diesel Combined Pump Sets (as the diesel pump was located on the roof of the building access was gained by Crane Lift in pieces at night and the pump was rebuilt in the pump room on the roof)
New 150mm Combined Ring Main with high and low stages including Pressure Reduction Stations
New 150mm H Pattern and Tank Model Boosters
Modification of existing Sprinkler Systems to suit new Light Hazard Systems on 12 levels
New Flow Switch Control Valves on every floor
Installation of new 80,000 litre Modular Tank on roof and all associated materials
Core Drilling and Fire Rating of all Fire Rated walls and floors and the supply of Fire Rating registers
This project had 3 Levels of occupied tenants (Travelodge) which meant that the existing standalone Sprinkler and Hydrant Systems had to remain on line during the construction period and the hydrants system was decommissioned and the existing sprinklers connected to the new system at the final hand over stage

DELUGE SYSTEM UPGRADE ANN STREET SUBSTATION SURRY HILLS

NEW FIRE SERVICE INSTALLATION IN STORES WAREHOUSE HOLSWORTHY ARMY BARRACKS